Our team’s strong experience in AHCA (Agency For Health Care Administration), owner equipment coordination, medical gas and active campus coordination allows patient care to continue without interruption.
MIAMI, FL
Chemo pharmacy renovation that included a complete interior demolition, new buildout with upgraded finishes, Carter Health Systems equipment coordination, mechanical, electrical and plumbing.
OWNER/CLIENT
Nicklaus Children’s Hospital
MIAMI, FL
Existing Cath equipment and controls replacement, new finishes including ceiling floors and millwork, mechanical, electrical and plumbing, medical gas, and owner equipment coordination.
OWNER/CLIENT
HCA East Florida
Fort Lauderdale, FL
Owner equipment coordination and implementation for a fully automated core lab. The scope of work consisted of interior demolition, finish upgrades and associated mechanical, electrical and plumbing work.
OWNER/CLIENT
Holy Cross Hospital
Lauderdale Lakes, FL
Replacement of an existing 125 KW generator and a 90 KW generator and a new 800 KW generator with the required fuel to run for 96 hrs to service 100% of the load demand of the entire building.
OWNER/CLIENT
St. John’s Rehabilitation
Hospital & Nursing Center
Fort Lauderdale, FL
An equipment replacement for an existing ground floor Linear Accelerator vault in Holy Cross Hospital's Cancer Center. Structural supports, shielding vault system, MEPs and upgraded finishes were required for this vault.
OWNER/CLIENT
Holy Cross Hospital
Miami, FL
Design Build services for a plastic surgery physicians office at South Miami Hospital. Demolition, new drywall partitions, acoustical ceiling, flooring, lighting, millwork and associated mechanical, electrical and plumbing work.
OWNER/CLIENT
Jeffrey Epstein, MD, PA DBA Epstein Bared
MIAMI, FL
Cath Lab equipment replacement and renovation with selective demolition, new interior finishes, new mechanical, electrical, plumbing, medical gas, and owner equipment coordination.
OWNER/CLIENT
Kendall Regional Medical Center
Ft. LAUDERDALE, FL
Interior medical office build-out including full demolition, new partitions and ceiling, updated lighting systems, custom millwork, mechanical, electrical, plumbing and owner equipment coordination.
OWNER/CLIENT
Holy Cross Hospital
South MIAMI, FL
This Design Build project includes the exterior expansion for a ground floor linear accelerator vault room. New foundations, structural supports, shielding vault system, MEPs, and finishes were required for the additional vault.
OWNER/CLIENT
Innovative Cancer Institute
MIAMI, FL
Interior renovation of four observation rooms with selective demolition and finish upgrades to the patient rooms and bathrooms.
OWNER/CLIENT
HCA East Florida
Palm Beach Gardens, FL
Interior alteration and reconfiguration of space within an existing outpatient facility. New millwork, ceiling, finishes and lighting.
OWNER/CLIENT
Nicklaus Children’s Hospital
MIAMI, FL
Expansion of a Cath Lab with demolition, a full interior build-out, mechanical, electrical, plumbing, medical gas, and owner equipment coordination.
OWNER/CLIENT
Kendall Regional Medical Center
Ft. Lauderdale, FL
Selective interior demolition, new buildout with upgraded finishes to the office, pharmacy, dispensary and waiting areas. Carter Health Systems equipment coordination and installation, mechanical, electrical and plumbing work.
OWNER/CLIENT
Holy Cross Hospital
MIAMI, FL
8,000 SF medical OB/GYN office build-out with full demolition, new partitions and ceiling, updated lighting systems, custom millwork, mechanical, electrical, plumbing, and owner equipment coordination.
OWNER/CLIENT
HCA East Florida
Miami, FL
X-Ray Room Replacement and Reading Room renovations, and site prep for the installation of STERIS Synergy. Also Washer/Disinfection and SCS Conveyors to receive ICRA, demolition, new floor sink, electrical, and plumbing.
OWNER/CLIENT
Kendall Regional Medical Center
Oakland Park, FL
Replacement of a radiology department CT Scanner and supporting equipment. Selective demolition, new flooring, ceiling grid, lead-lined drywall, owner equipment replacement, new rooftop air handling and associated mechanical and electrical.
OWNER/CLIENT
Holy Cross Healthplex
MIAMI, FL
Complete interior demolition, new corridor with new flooring, wall protection, doors and ceiling finish upgrades, mechanical, electrical and plumbing upgrades.
OWNER/CLIENT
Nicklaus Children’s Hospital
HIALEAH, FL
New nurse station with flooring, millwork, electrical, glass and ceiling systems changed out in a fully occupied floor. Also included in the scope are upgrades to door security and hardware, plumbing fixtures, and the outdoor courtyard.
OWNER/CLIENT
Tenet Health
Ft. LAUDERDALE, FL
16,000 SF full floor renovation with five phases of construction. Minor demolition, new flooring, wallcovering and wall protection in corridors and patient rooms along with new built-in millwork, restroom finishes and new nurse station.
OWNER/CLIENT
Broward Health
MIAMI, FL
Interior Hybrid OR renovation with demolition, a full interior build-out, mechanical, electrical, plumbing, medical gas, and owner equipment coordination.
OWNER/CLIENT
Nicklaus Children’s Hospital
MIAMI, FL
Three phased interior outpatient rehabilitation renovation with selected demolition, custom millwork, and new interior finishes.
OWNER/CLIENT
Mercy Hospital
MIAMI, FL
Renovation of a 7,000 SF critical care unit with MEP fixture replacements, upgrades of new flooring, millwork, paint and ceiling.
OWNER/CLIENT
HCA East Florida
The Edge Construction team has expertise in managing everything from small renovations to ground-up development in a variety of sectors.
Ft. LAUDERDALE, FL
A redevelopment project consisting of two separate buildings in Fort Lauderdale. Work included extensive exterior facade improvements, building code upgrades to existing structures and site work, interior build-outs for tenant offices and shell retail.
OWNER/CLIENT
Fuse Group Investment Companies
FT. Lauderdale, FL
Interior build-out of an office space on East Las Olas. Scope of work included interior demolition of the existing space, followed by full build-out including new interior partitions, ceilings, mechanical, electrical, plumbing, fire protection, high-end finishes and custom millwork.
OWNER/CLIENT
GQG Partners
MIAMI BEACH, FL
Preconstruction and construction services for site renovations to Euclid Avenue walkway adjacent to Lincoln road in Miami Beach. Scope of work consisted of demolition of the current roadway, site irrigation, lighting, hardscaping and landscaping renovations.
OWNER/CLIENT
Jameck Development
MIAMI BEACH, FL
This project includes preconstruction and construction services for Creative Artists Agency in Miami Beach Florida. The scope of work consists of demolition and a full interior build-out including glass wall systems, high end finishes and custom millwork. This project is located in a fully occupied office building.
OWNER/CLIENT
Creative Artists Agency
Ft. LAUDERDALE, FL
New office with interior demolition of an existing office and full build-out including high-end finishes, back painted glass feature walls, and custom reception desk. This project was completed in a fully occupied office building.
OWNER/CLIENT
WIRE Management
Ft. Lauderdale, FL
Construction services for an interior law office renovation in an occupied building in Fort Lauderdale. This build-out includes full demolition, new partitions and ceiling, flooring, glass partitions, lighting systems, custom millwork, mechanical, electrical and plumbing.
OWNER/CLIENT
Moffa, Sutton & Donnini
MIAMI, FL
New office build-out from shell space at Latitude One in Miami Florida to include glass partitions for surrounding offices, a floating drywall ceiling, break room, server room, conference rooms and open office areas. This project was completed in a fully occupied mixed use building.
OWNER/CLIENT
Rosaprima
MIAMI BEACH, FL
Preconstruction and construction services for an 10,000SF lobby renovation. Renovations to the existing lobby, conference room and corridors on the ground floor including luxurious finishes, new flooring, millwork, lighting and wall covering.
OWNER/CLIENT
Continuum on South Beach North Tower Association, Inc.
MIAMI, FL
Preconstruction and construction services for a two phased interior office build-out. Scope of work consisted of demolition, new partitions and ceiling, flooring, lighting systems, millwork, mechanical, electrical and plumbing.
OWNER/CLIENT
Colliers
MIAMI BEACH, FL
Preconstruction and construction services for an atrium and multiple elevator landing renovation with selective demolition, new interior finishes, custom millwork, glass wall systems, and electrical within multiple phases to ensure the building stays completely operational during the duration of construction.
OWNER/CLIENT
JLL
BRICKELL KEY, FL
Interior office build-out in Brickell Key Florida. The scope of work consists of demolition and a full interior build-out including mechanical, electrical and plumbing, glass wall systems, modern clean finishes and custom millwork. This project is located in a fully occupied office building.
OWNER/CLIENT
PRO-COLOMBIA
MIAMI BEACH, FL
6,000 SF office expansion to adjacent suite, and renovations of existing office finishes. A project phasing plan was implemented to allow for the existing office to function during construction without shutdowns in fully occupied office building.
OWNER/CLIENT
CBRE